Turnkey current supply systems
We offer a comprehensive turnkey current supply service, which includes all stages from measurement to installation of a new power supply system. Our specialists have many years of experience and guarantee high-quality of all work.
The service includes the following steps:

Measuring the room
This stage is crucial for the successful design and installation of a current supply system. At this stage, our specialists perform the following tasks:

Initial consultation: an engineer arrives at the facility to discuss your needs and requirements for the current supply system. You can ask any questions regarding the installation process, equipment selection, and other aspects of the project;

Room inspection: a visual assessment of the condition of the room is carried out, all structural features of the building are taken into account, such as the height of the ceilings, the presence of columns, partitions and other elements that may affect the placement of the current supply system;

Precise measurements: precise measurements of the room are performed, including the length, width, height, and distance between various infrastructure elements. This is necessary to accurately calculate the amount of materials and determine the location of the system components;

Analysis of the existing infrastructure: the condition of already installed utilities, such as electrical networks, air ducts and pipelines, is being studied. If integration of new elements with existing systems is required, this will also be taken into account during the design process;

Assessment of operating conditions: determines the load level on the current supply system, environmental conditions (temperature, humidity), as well as possible sources of interference and vibrations that may affect the operation of the system;

Preparation of the report: based on the results of the survey, a detailed report is prepared, which contains all the necessary information for the next stage – the design of the current supply system.

Current supply system design
Based on the data obtained at the measurement stage, the process of designing a current supply system begins. This stage includes several important steps:

Concept development: the concept of a future current supply system is being created based on the collected data, technical requirements, customer wishes and recommendations of regulatory documents;

Equipment selection: suitable system components are selected based on their technical characteristics and compatibility with other system elements. The equipment must meet the operating conditions and ensure maximum productivity;

Load calculation: electrical load calculations are performed to check the system’s ability to cope with the required parameters without overloads and emergencies;

Circuit design: a detailed layout of all components of the current supply system is being developed, taking into account the convenience of access to equipment for maintenance and repair, as well as minimizing installation costs;

Simulation and simulation: if necessary, the system is modeled in different operating modes to check its operability and resistance to possible failures;

Documentation: a complete set of project documentation is prepared, including drawings, equipment specifications, design data and installation instructions, all documents are checked and approved by the customer before the start of installation work.


Dismantling of the old and installation of the new busbar
When the project is ready and approved, the final stage begins – the dismantling of the old system elements and the installation of new ones.

Site preparation: before starting work, the work area is prepared. Temporary fences are installed, access to the work site is provided, and unnecessary items and materials are removed;

Power outage: ensures a safe power outage at the site where the work will be carried out. This is necessary to prevent accidents and damage to the equipment;

Dismantling of old equipment: the old busbar is carefully dismantled, taking all precautions. Old wiring, fasteners, and other components that are no longer required are removed;

Installation of new equipment: the installation of a new busbar according to the project begins. The components are installed in pre-prepared places, connected to power sources and other elements of the system;

Checking the connections: after the installation is completed, all connections are checked for reliability and compliance with technical requirements;

System testing: the system is tested in various operating modes. Voltage, current, temperature, and other parameters are checked;

Final setup: if necessary, the final configuration of the system is performed so that it works as efficiently and safely as possible;

Delivery of the facility: after completion of all work, the customer accepts the facility, signs an act of completed work and receives warranty obligations for the equipment.
Рассчитаем проект прямо сейчас!
Оставьте свои контактные данные, и наши специалисты свяжутся с Вами в ближайшее время.
Why choose us?

Experience and professionalism: our team consists of qualified specialists with many years of experience in the field of design and installation of current supply systems;

Quality and reliability: we use only proven equipment and materials, which ensures the high reliability of our systems;

Individual approach: we develop unique solutions, taking into account all your wishes and requirements;

Work performance guarantee: We are confident in the quality of our work and provide a guarantee for all services performed.